RO CONDUCTIVITY MONITORING

Configure each measurement point as a complete loop

Start with the RO stream and operating decision, then match the conductivity cell, controller, installation and alarm response. If the point or operating conditions are not yet known, send what you have and mark the rest for review.

APPLICATION CONFIGURATION

Share the measurement point, water conditions and required signal. Tenber will review the controller and cell configuration before quotation.

Request Configuration Review

Assign each measurement point an operating decision

Point Application purpose Project data to confirm
Feed Track incoming water and pretreatment changes Normal/peak conductivity, pressure, temperature and pipe size
Permeate Monitor product-water quality and membrane trend Expected range, temperature, sample flow and alarm response
Concentrate / reject Observe concentration and recovery-related changes Upper range, chemistry, pressure and safe access
Post-polishing Check quality after EDI, mixed bed or another polishing stage Required unit, reference temperature and downstream action

Choose one or more points above, or write “measurement point to be confirmed” in the configuration request. Avoid installation beside chemical injection, stagnant dead legs or locations where air can collect.

Confirm the water conditions and measurement range

For each point, provide the stream name, expected minimum/normal/maximum conductivity, temperature, pressure, sample flow, chemistry and required units or reference temperature. For low-conductivity permeate, confirm the expected range and sample arrangement before choosing a cell. Do not use a generic alarm value as a substitute for the site baseline.

Match the conductivity cell, controller and installation

Select the cell constant and electrode/material arrangement from the actual conductivity range and water conditions. Confirm whether a flow cell, bypass, insertion fitting or another arrangement suits the pipe, flow, maintenance and isolation plan. Then verify compatibility with the selected controller model, temperature input, cable and mounting arrangement.

Review current models such as EC-703 and EC-702 against the project’s measurement range, cell and required functions; neither model is preselected until those conditions are confirmed.

Plan alarms and operator response

Set alarm thresholds from the site baseline and process limits. Define high/low limits, delay, hysteresis and sensor-fault behavior, and document the operator’s first checks: sample, temperature, flow, pressure, pretreatment, membrane condition or sensor cleanliness.

Connect the loop to PLC or SCADA

Confirm whether the project uses 4–20 mA, RS485 Modbus RTU, relay contacts or a combination. For analogue integration, document range scaling, decimal position and fail value. For Modbus, confirm address, baud rate, parity, register map, byte order and update interval against the selected model’s documentation.

Define whether the PLC receives compensated conductivity, uncompensated conductivity, temperature, alarm state and sensor-fault state. Test normal, high, low, calibration and power-loss conditions before handover.

Choose installation and commissioning checks

Record the flow direction, sample conditioning, cable route, grounding, enclosure location and environmental conditions. At handover, verify the tag and point, wiring, units and compensation, compare with a suitable reference under stable flow, test alarm and PLC/SCADA behavior, then record the baseline and maintenance plan.

Configuration information to send

Send the process flow diagram or point list, stream names, normal/minimum/maximum conductivity, temperature, pressure, chemistry, sample flow, cell or installation details if known, cable length, signal, alarm logic, quantity, destination and documentation needs. Unknown items may be marked “to be confirmed”.

RO APPLICATION SELECTION SUPPORT

Request an RO conductivity configuration review

Choose a measurement point if known. If not, submit the project conditions available and ask us to help define it.

Request Configuration Review

Frequently asked questions

Where should the PLC alarm be generated?

Define responsibility in the control narrative. The controller may provide a local alarm while the PLC handles process interlocks.

Is a bypass always required?

No. It depends on the pipe, flow, access and maintenance plan. A bypass can simplify isolation and calibration when the process arrangement supports it.

Assigned topic: Application and project configuration. See RO conductivity monitoring.